Legnica copper smelter
The smelter was commissioned in 1953 as a secondary smelter to provide anodes to the adjacent Legnica refinery. Capacity at commissioning was 38kt/...
Mount Isa copper smelter
The Mount Isa copper smelter was commissioned in 1953 to treat the concentrate from the Mount Isa mine. A new smelter with a capacity of 100kt/a bl...
Khetri (closed) copper smelter
The smelter was commissioned in 1974 with the present capacity of 31kt/a anode. Concentrate is mainly provided from the adjacent mine and from Hind...
Kansanshi copper smelter
The smelter started operating in February 2015 and its capacity is 300kt/a anodes. Wood Mackenzie’s asset reports are built from the bottom up, inc...
Naoshima copper refinery
The refinery is located on Naoshima Island, Kagawa Prefecture in the Seto Inland Sea. Sea links via the company's own wharf for 20kt vessels are ex...
Olen copper refinery
The refinery is located at Olen, 30km east of Antwerp on the Herentals-Bocholt canal. It has good road, rail and canal links. The original tankhous...