T-Block
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- No further investment expected
- Decommissioning outlook: T-Block fields
-
Platform details
- Toni
- Thelma
-
Development drilling
- Tiffany
- Toni
- Secondary recovery
- Capital costs
- Tiffany
- Toni
- Thelma
- Decommissioning costs
-
Operating costs
- Emissions Trading Scheme (ETS)
- Global Economic Model (GEM) file
- Toni
- 2 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Capital Costs Pre-2000 to 2007 (US$ million)Capital Costs 1991 to 1995 (US$ million)Capital Costs Pre-1997 to 2005 (US$ million)
-
Capital Costs 2027 to 2032 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026Remaining Present Value Price SensitivitiesCash flow (US$ million)
- 25 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Lionheart lithium mine
A detailed analysis of the Lionheart lithium brine operation
$2,250Roystonea and other discoveries (Block 52)
Petronas and ExxonMobil have made three deepwater discoveries in Block 52: Sloanea (2020), Roystonea (2023) and Fusaea (2024). The ...
$3,720Alabaster (MC 397)/Zinc (MC 354)
Alabaster (MC 397) and Zinc (MC 354) are two medium-sized gas/condensate fields located in the eastern part of the Mississippi Canyon ...
$3,720