Luda Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Luda 4-2/5-2/10-1 joint development
- Suizhong 36-1 Phase I & Luda 5-2 adjustment project
- Luda 27-2/32-2
- Luda 10-1 adjustment projects
- Luda 16-3/16-3S/21-1 joint development
- Luda 29-1 development project
- Luda 5-2N phase II
- Thermal recovery techniques
- Exploration Costs
- Capital Costs
- Operating Costs
- Cash Flow
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index MapLuda Area MapParticipation
-
Reserves (2P) at 01/01/2026Production (2016-2025)Luda Fields Production ProfileExploration Costs 2018 to 2026 (US$ million)Capital Costs Pre-2017 to 2025 (US$ million)Operating Costs 2026 to 2035 (US$ million)Cash Flow (US$)PV Table (US$)
- 5 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Gjøa Area
The Gjøa Area consists of three oil and gas fields 60 kilometres north of the Troll Øst field in the Northern North Sea.
$5,280Qinhuangdao Area
The Qinhuangdao Area includes the Qinhuangdao 32-6 PSC and the Bozhong area concession in the central area of the Bohai Gulf.
$3,720Snohvit Area (LNG)
The Snøhvit Area is an integrated upstream, pipeline, and gas liquefaction development.
$6,900